Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Kingrui |
Model Number : | KR0922 |
Certification : | ISO9001:2008 |
Price : | Negotiable |
Payment Terms : | T/T 50% as deposit 50% before shipment |
Supply Ability : | 1200-1500 units per month |
Delivery Time : | Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing. |
Plastic Connector Mold Parts 60 +/-1HRC For Electrical Mould Parts
Customized Connector Mold Parts for Electronics
Mold insert | for connector mold |
Material | imported ELMAX |
Size | as per customer's drawing |
Hardness | 60+/-1 HRC |
Treatment | High tempertature tempering and annealing |
Surface treatment | Plating or Nitriding, TiCN etc. |
Grinding Precision | 0.002MM |
EDM Precision | 0.002MM |
Surface Roughness for EDM | Ra 0.1 to mirror EDM |
Clearance Angle | <0.05 |
MOQ | 1 PCS |
Origin of Material | America ,Japan, Sweden |
Machining | Grinding,EDM |
Lead time | 7 days |
Delivery | By DHL |
Our Precision Mold Part Description
| ELMAX /SKD61/ PD613/ 1.2344/ H13/ DC53 etc. |
| Polishing, Mirror Polishing , PVD Coating, DLC Coating |
| Grinding, Wire-cut, electric discharge master( EDM), CNC
milling,etc, |
|
|
INFORMATION TO INQUIRY |
|
PAYMENT TERM | T/ T 50% as deposit 50% before shipment |
A. How to ensure the quality of the parts?
QAULITY IS THE SOUL OF MY COMPANY, and we have completed quality
system such as ISO certification and quality team to ensure every
process are meet the quality requirement. We want all of our
customers have the feeling of WITH US YOUR MOENY IN SAFE YOUR
BUSINESS IN SAFE
B. How about delivery?
TIME IS GOLD FOR YOU AND ME. Basically the sample lead time is 7~10
days, and the main order lead time is 15~30 days. And to ensure the
delivery on time, we will take photos and update the produce status
to customer on time.
![]() |